PACKET
NUMBER
|
PACKET TITLE
|
CRED
|
CONT
HOURS
|
|
UNIT 1
|
PLANT SAFETY
|
| INPF 1A |
INTRODUCTION TO SAFETY |
0.25 |
6 |
| INPF 1B |
PERSONAL PROTECTIVE EQUIPMENT |
0.17 |
4 |
| INPF 1C |
ELECTRICAL SAFETY |
0.17 |
4 |
| INPF 1D |
FIRE PROTECTION |
0.21 |
5 |
| INPF 1E |
GOVERNMENT SAFETY REGULATIONS |
0.08 |
2 |
| |
UNIT TOTAL
|
0.88
|
21
|
| |
|
UNIT 2
|
MATHEMATICS FOR PIPEFITTING
|
| INPF 2A |
MATHEMATICS I |
0.17 |
4 |
| INPF 2B |
MATHEMATICS II |
0.67 |
16 |
| INPF 2C |
MATHEMATICS III |
0.67 |
16 |
| |
UNIT TOTAL
|
1.51
|
36
|
| |
|
UNIT 3
|
INTRODUCTION TO PIPEFITTING
|
| INPF 3A |
BASIC PIPEFITTING SCIENCE |
0.08 |
2 |
| INPF 3B |
BASIC RATIO OF PIPE CAPACITIES |
0.08 |
2 |
| INPF 3C |
TYPES OF PIPING |
0.17 |
4 |
| INPF 3D |
PIPEFITTING TOOLS & MATERIALS |
0.25 |
6 |
| INPF 3E |
PIPE CONNECTIONS |
0.25 |
6 |
| INPF 3F |
PIPE CUTTING & THREADS |
0.17 |
4 |
| INPF 3G |
PIPE FITTINGS |
0.38 |
9 |
| INPF 3H |
VALVES MANUAL |
0.33 |
8 |
| INPF 3J |
VALVES SELF CONTAINED |
0.29 |
7 |
| INPF 3K |
PIPING SUPPORT |
0.25 |
6 |
| INPF 3L |
PIPING BLACK & GALVANIZED |
0.33 |
8 |
| INPF 3M |
PIPING STAINLESS |
0.33 |
8 |
| INPF 3N |
PIPING FLANGED |
0.42 |
10 |
| INPF 3P |
PIPING PVC |
0.29 |
7 |
| INPF 3Q |
PIPING FLARE |
0.25 |
6 |
| INPF 3R |
PIPING COMPRESSION |
0.25 |
6 |
| INPF 3S |
PIPING COPPER SWEAT |
1.67 |
40 |
| INPF 3T |
TUBE BENDING |
0.29 |
7 |
| INPF 3U |
PIPING COMBINATIONS |
0.42 |
10 |
| |
UNIT TOTAL
|
6.50
|
156
|
|
|
|
UNIT 4
|
CODE AND THE PIPEFITTING TRADE
|
| INPF 4A |
PURPOSE OF THE PLUMBING CODE |
0.08 |
2 |
| INPF 4B |
USING THE PLUMBING CODE |
0.17 |
4 |
| INPF 4C |
REQUIRE FOR PIPING INSTALLA |
0.25 |
6 |
| INPF 4D |
IMPORTANCE OF BACKFLOW PREVENT |
0.96 |
23 |
| INPF 4E |
PURPOSE OF TRAPS |
0.29 |
7 |
| INPF 4F |
PURPOSE OF NFPA |
0.08 |
2 |
| INPF 4G |
USING THE NFPA |
0.17 |
4 |
| INPF 4H |
WET FIRE PROTECTION SYSTEMS |
0.08 |
2 |
| INPF 4J |
INSTALL WET FIRE PROTEC SYSTEM |
0.29 |
7 |
| INPF 4K |
DRY FIRE PROTECTION SYSTEMS |
0.08 |
2 |
| INPF 4L |
INSTALL DRY FIRE PROTEC SYSTEM |
0.25 |
6 |
| INPF 4M |
TEST FIRE PROTECTION SYSTEMS |
0.17 |
4 |
| INPF 4N |
PURPOSE OF ASME CODE |
0.08 |
2 |
| INPF 4P |
USING THE ASME CODE |
0.17 |
4 |
| INPF 4Q |
IMPOR OF PRESSURE SAFETIES |
0.08 |
2 |
| INPF 4R |
PRESSURE TEST & LEAK TEST |
0.29 |
7 |
| |
UNIT TOTAL
|
3.49
|
84
|
|
|
|
UNIT 5
|
PIPING DIAGRAMS
|
| INPF 5A |
INTRODUCTION TO BLUEPRINTS |
0.08 |
2 |
| INPF 5B |
IDENTIFY PIPING SYMBOLS |
0.08 |
2 |
| INPF 5C |
READ & INTER PIPING DIAGRAMS |
0.17 |
4 |
| INPF 5D |
USING BLUEPRINTS FOR INSTALLA |
0.25 |
6 |
| INPF 5E |
TROUBLESHOOT WITH BLUEPRINTS |
0.17 |
4 |
| |
UNIT TOTAL
|
0.75
|
18
|
|
|
|
UNIT 6
|
THERMODYNAMICS AND HEATING THEORY
|
| INPF 6A |
TEMPERATURE |
0.17 |
4 |
| INPF 6B |
HEAT |
0.17 |
4 |
| INPF 6C |
EXPANSION |
0.17 |
4 |
| INPF 6D |
MELTING, BOILING & EVAPORATION |
0.25 |
6 |
| INPF 6E |
SENSIBLE HEAT & LATENT HEAT |
0.25 |
6 |
| INPF 6F |
TRANSMISSION OF HEAT |
0.17 |
4 |
| INPF 6G |
HEAT, WORK & EFFICIENCY |
0.17 |
4 |
| INPF 6H |
HEAT SOURCES & COMBUSTION |
0.33 |
8 |
| INPF 6J |
HEAT TRANSFER EQUIPMENT |
0.33 |
8 |
| INPF 6K |
HYDRONICS |
0.08 |
2 |
| |
UNIT TOTAL
|
2.09
|
50
|
| |
|
UNIT 7
|
FLUID AND GAS PROPERTIES
|
| INPF 7A |
THE ATMOSPHERE |
0.08 |
2 |
| INPF 7B |
GASES & THEIR EXPAN & COMPRES |
0.17 |
4 |
| INPF 7C |
LIQUIDS & PRESSURE |
0.17 |
4 |
| |
UNIT TOTAL
|
0.42
|
10
|
|
|
|
UNIT 8
|
INDUSTRIAL FLOW CONTROL
|
| INPF 8A |
BASIC PUMPS & TERMINOLOGY |
0.17 |
4 |
| INPF 8B |
CENTRIFUGAL PUMPS |
0.42 |
10 |
| INPF 8C |
POSITIVE DISPLACEMENT PUMPS |
0.42 |
10 |
| INPF 8D |
CONTROL THEORY |
0.33 |
8 |
| INPF 8E |
CONTROL VALVES |
0.50 |
12 |
| INPF 8F |
REGULATORS |
0.25 |
6 |
| INPF 8G |
PRESSURE REDUCING VALVES |
0.25 |
6 |
| INPF 8H |
ELECTROMECHANICAL CONTROLS |
0.25 |
6 |
| INPF 8J |
CONTROL AIR COMPRESSORS |
0.25 |
6 |
| INPF 8K |
PNEUMATIC CONTROLS |
0.67 |
16 |
| INPF 8L |
FLOW MEASUREMENT |
0.29 |
7 |
| |
UNIT TOTAL
|
3.80
|
91
|
| |
|
UNIT 9
|
BOILERS
|
| INPF 9A |
FUNDAMENTALS OF BOILERS |
0.17 |
4 |
| INPF 9B |
HOT WATER BOILERS |
0.42 |
10 |
| INPF 9C |
AIR TRAPS |
0.08 |
2 |
| INPF 9D |
LOW PRESSURE STEAM BOILERS |
0.29 |
7 |
| INPF 9E |
HIGH PRESSURE STEAM BOILERS |
0.54 |
13 |
| INPF 9F |
BOILER CONTROLS |
0.25 |
6 |
| INPF 9G |
BOILER SAFETIES |
0.08 |
2 |
| INPF 9H |
BOILER VALVES |
0.17 |
4 |
| INPF 9J |
BOILER BLOWDOWN |
0.08 |
2 |
| INPF 9K |
CONDENSATE RETURN |
0.50 |
12 |
| INPF 9L |
BOIL FEED WATER & MAK UP WATER |
0.25 |
6 |
| INPF 9M |
TROUBLESHOOTING BOILERS |
0.25 |
6 |
| INPF 9N |
BOILER PREVEN MAINTEN & INSPEC |
0.25 |
6 |
| |
UNIT TOTAL
|
3.33
|
80
|
|
|
|
UNIT 10
|
STEAM
|
| INPF 10A |
STEAM SAFETY |
0.13 |
3 |
| INPF 10B |
FUNDAMENTALS OF STEAM |
0.25 |
6 |
| INPF 10C |
STEAM TRAPS |
0.67 |
16 |
| INPF 10D |
WATER HAMMER |
0.08 |
2 |
| INPF 10E |
STEAM COILS & RADIATORS |
0.33 |
8 |
| INPF 10F |
VACUUM BREAKERS |
0.17 |
4 |
| INPF 10G |
STEAM BUNDLES |
0.42 |
10 |
| |
UNIT TOTAL
|
2.05
|
49
|
| |
|
UNIT 11
|
PIPING APPLICATIONS
|
| INPF 11A |
PIPING & VENT COMMER GAS SYS |
0.08 |
2 |
| INPF 11B |
INSTALLING WATER HEATERS |
0.17 |
4 |
| INPF 11C |
INSTALL COMP AIR PIPING SYS |
0.08 |
2 |
| |
UNIT TOTAL
|
0.33
|
8
|
| |
|
UNIT 12
|
SPECIAL PIPING APPLICATIONS
|
| INPF 12A |
VICTUALIC |
0.33 |
8 |
| INPF 12B |
FRP |
0.08 |
2 |
| INPF 12C |
GREENTHREAD |
0.08 |
2 |
| INPF 12D |
CPVC |
0.08 |
2 |
| |
UNIT TOTAL
|
0.57
|
14
|
| |
|
UNIT 13
|
PIPING SYSTEM MAINTENANCE
|
| INPF 13A |
PIPING SYSTEM MAINTENANCE I |
0.25 |
6 |
| INPF 13B |
PIPING SYSTEM MAINTENANCE II |
0.25 |
6 |
| INPF 13C |
PIPING SYSTEM MAINTENANCE III |
0.25 |
6 |
| |
UNIT TOTAL
|
0.75
|
18
|
| |
PROGRAM TOTAL |
26.47 |
635 |
|
|